Marine Design & Construction
  • Home
  • What we do
    • Design & Consultancy
    • Construction & Installation
    • Tugdock – The World’s First Road-Transportable Floating Dry Dock
  • Gallery
  • Videos
  • News
  • Contact Us
  • Home
  • What we do
    • Design & Consultancy
    • Construction & Installation
    • Tugdock – The World’s First Road-Transportable Floating Dry Dock
  • Gallery
  • Videos
  • News
  • Contact Us

Jubilee Gardens Pier, London

Jubilee Gardens Pier, London

  • Jubilee Pier

    The tubular steel Jubilee Gardens Pier London. Spoil from London Underground being taken away by 1000 tonne barges.

  • Jubilee Pier pontoon

    The pontoon was moored by radial arms to sunken, stone filled barges as piling was not allowed due to London Underground tunnel proximity.

  • Jubilee Pier

    The pontoon was moored for 3 years. The London Eye is now in this position on the River Thames.

  • Jubilee Pier

    The pontoon rolled under water when hit by heavy barges and, in doing so absorbed berthing energy. Design by Beckett Rankine.

0

Client:

Balfour-Beatty

© 2025 Marine Design & Construction. Marine Design & Construction

 

Loading Comments...
 

You must be logged in to post a comment.