O2 Arena Pier – A 90 metre x 15 metre tubular steel pontoon with galvanised steel and recycled plastic plank decking.
-
-
-
5 rows of parallel 1.85m diameter x 12mm wall steel tubes form the floatation and structural element of the pontoon.
-
The pontoon designer Shane Carr and his Father pose to show the proportions of the huge structure.
-
The 84 metre, 160 tonne, 3 point bearing brow access to the pier during build. Brow designers Richard Rogers and Beckett Rankine.
-
Moving the brow towards the quay edge ready for collection.
-
The Smit Taklift 7 carried the brow effortlessly down the River Medway.
-
O2 Arena brow being carried up the River Thames ready for installation.
-
The 9 metre wide brow in position.
-
The single point polymeric brow bearing on the pontoon.
You must be logged in to post a comment.