Installation
We have installed our pontoon systems worldwide; from the UK to Australia. Wherever the project, our installation team will work closely with local marine and civil engineering contractors to ensure a safe implementation.
Below are a few photos of the team in the ‘construction’ stage of projects.
Lifting a concrete pontoon into the water prior to pouring on the concrete deck.
To build this pontoon at Woolwich Arsenal fast and simply, the frame was designed with identical ‘cells’. All base plates were rolled to achieve strength without stiffeners.
One of over 40 High Holding Power anchors that moor the pontoons, River Mersey.
Single point roller bearing on Woolwich Arsenal Brow
The 84 metre, 160 tonne, 3 point bearing brow access to the pier during build. Brow designers Richard Rogers and Beckett Rankine, O2 Arena.
5 rows of parallel 1.85m diameter x 12mm wall steel tubes form the floatation and structural element of the pontoon, O2 Arena.